from under ship’s tackle and
doing the lashing and securing for
the cargo on the truck then move
it to the final destination. (2017)
Ship Agency, Stevedoring operation and handling for HL cargo at Sokhna Port
Discharging Transformer with gross
weight 185 tons at Sokhna port. (January
2018)
Ship Agency, Stevedoring operation and handling for HL cargo at Adabiya Port
Discharging General cargo plus HLs cargo
for Egyptian Cement Factory with gross
weight 150 tons at Adabiya port. (January
2019)
Stevedoring operation and handling for General cargo at Alexandria Port
Discharging Water pipes for Hassan
Allam Constructions (HAC) Asyut
project at Alexandria port. (May –
July 2019)
Ship Agency, Stevedoring operation and handling for HL cargo at Alexandria Port
Loading General cargo for Arab Steel
Fabrication project (ASF) shipped to
Duqm, Oman from Alexandria port.
(August 2020)
Ship Agency, Stevedoring operation and handling for General cargo at Alexandria Port
Loading steel structure for National Steel
Fabrication in Hamburg (NSF) from
Alexandria port. (October 2020)
Ship Agency, Stevedoring operation and handling for HL cargo at Alexandria Port
Discharging General cargo plus HLs cargo
for Markby Steel Factory & Siemens with
gross weight up to 156 tons at Alexandria
port. (September 2020)
Ship Agency, Stevedoring operation and handling for General cargo at Alexandria Port
Loading ODC cargo for El Fateh for Industries
and Steel Constructions from Alexandria port.
(July 2021)
Ship Agency, Stevedoring operation and handling for General cargo at Alexandria Port
Discharging HL & ODC Cargo OF TBM Project
(HERRENKNECHT) for HA Construction &
Concord for Engineering & Contracting on
behalf of the EGYPTIAN ARMAMENT
AUTHORITY at Alexandria port. (December
2022)
Ship Agency, Stevedoring operation and handling for General cargo at Alexandria Port
Loading HL & ODC Cargo OF EL Fateh For
Industries and Steel Constructions for APM
Terminals Med port 2 Tangier port Project at
Alexandria port. (June 2023)
Ship Agency, Stevedoring operation and handling for General cargo at East Port Said Port
Discharging HL & ODC Cargo OF Sky Ports for
Salt Terminals in East Port Said port Project at
East Port Said port. (December 2023)
Ship Agecny, Stevedoring operation and handling for General cargo at Alexandria Port
Discharging Rail wagons Cargo OF SALCEF
SPA EGYPT BRANCHE on rail alongside
quay number 35 at Alexandria port. ( August
2023)
Ship Agency, Stevedoring operation and handling for General cargo at Alexandria Port
Discharging HL & ODC Cargo OF TBM Project
(HERRENKNECHT) for Arab Contractors &
Petrojet on behalf of the EGYPTIAN
ARMAMENT AUTHORITY at Alexandria port.
(January 2023)
Ship Agency, Stevedoring operation and handling for HL cargo at Alexandria Port
Discharge General cargo for Egyptian Black
Sand Company project at Alexandria port.
(March 2021)
Ship Agency, Stevedoring operation and handling for General cargo at Alexandria Port
Loading HL & ODC Cargo OF EL Fateh For
Industries and Steel Constructions for APM
Terminals Med port 2 Tangier port Project at
Alexandria port. ( September 2023)